🏒 HDB Renovation Specialist

HDB Renovation Contractor Singapore

Affordable, high-quality HDB flat renovations for BTO and resale homes across Singapore with direct contractor rates.

HDB Renovation Contractor Singapore

Service Overview

Renovating your HDB flat should be exciting, transparent, and cost-effective. As a direct renovation contractor in Singapore, Tabeeb Contractor handles complete BTO and resale flat makeoversβ€”from permit clearance to hacking, masonry screeding, tiling, vinyl flooring, false ceilings, electrical rewiring, and custom carpentry.

πŸ“‹ Scope of Work & Deliverables

βœ“ Complete HDB BTO and resale flat renovation packages
βœ“ HDB renovation permit submission assistance and guideline compliance
βœ“ Kitchen and bathroom wet area hacking, waterproofing, and retiling
βœ“ Living room and bedroom flooring (pre-packed cement screed, homogeneous tiles, SPC vinyl)
βœ“ Concealed wiring, DB box upgrades, power point distribution, and LED cove lighting
βœ“ False ceiling installation, L-box design, and full unit plastering & painting

Why Engage Tabeeb Contractor

We are a direct builder with experienced, in-house craftsmenβ€”delivering cost savings, rapid timelines, and strict compliance with Singapore statutory regulations.

Direct Contractor Rates

Transparent pricing without interior design markup fees, saving thousands on your renovation budget.

HDB Guideline Adherence

Strict compliance with HDB renovation timing curfews, corridor protection, and noise protocols.

Complete One-Stop Service

From initial hacking to final chemical wash and handover, all trades are managed under one roof.

Written Workmanship Warranty

Peace of mind backed by our written warranty on tile bonding, waterproofing, and electrical works.

Execution & Handover Process

Every project follows a transparent, monitored timeline from initial blueprint consultation to final handover.

01

Consultation & Blueprint Review

We analyze your HDB floor plan to optimize layout flow, storage, and lighting.

02

Permit Clearance

We assist with submitting required renovation permit documents before noisy works start.

03

Hacking & Wet Works

Protect common lift lobbies, carry out hacking, pipe routing, waterproofing, and screeding.

04

Finishing & Handover

Install ceilings, lighting, flooring, painting, and complete a spotless chemical wash before key handover.

Frequently Asked Questions

A standard BTO flat renovation takes approximately 4 to 6 weeks. A resale flat requiring complete hacking, retiling, and rewiring typically takes 6 to 8 weeks.

Non-structural partition walls may be hacked with prior written approval from HDB. Load-bearing structural walls, pillars, and RC columns cannot be touched. We verify all blueprints prior to commencing works.

Know someone renovating or reinstating?

Share this direct contractor link with them on WhatsApp or Facebook.

Ready to Schedule Your Site Inspection?

Our licensed technicians and project coordinators are ready to evaluate your floor plan and provide transparent direct contractor quotations.

Chat on WhatsApp with Engineer
Link copied! Ready to share on WhatsApp or Facebook.